Second Story Deck Removal
The beams on the second story deck were starting to rot, and there was a possibility of the rot traveling into the wall because of how it was framed. So we removed the deck and beams, replacing the patio slider with a window, making sure that it would seem natural like the window was meant to be there.
handymanhart88
5 days ago1 min read


Pump House
This used to be an attached covered woodshed, our client wanted us to switch it into a pump house so that they could take the water pressure tank out of their kitchen pantry. So we insulated it, put a front wall and door in, covered up the walls with plywood and ran the pressure tank through the back wall of the shed.
handymanhart88
Mar 101 min read


Deck Replacement
We redid this 200 sqf deck on the back of our clients house using Azek Advanced PVC decking in the american walnut color, with a stained doug fir skirting. The reason why we used a PVC decking was because it had roughly double the life span of other medium grade decking while staying similar in price, so our client decided to use it instead. We hadn’t used Azek Decking yet, but we were quite pleased with the ease of use for working with it.
handymanhart88
Mar 31 min read


Rental Flooring Replacement
We were hired to fix up this rental, a water leak came in through the door, seeping into the flooring which was put over old carpet. We took out all of the carpet, flooring, trim and then resealed the door, we put in a new plywood underlayment to ensure that it was level when putting in the new flooring and trim.
handymanhart88
Feb 251 min read


Sun Room Remodel
This sun room had a water leak coming in through the windows, the decision to make it into a deck was due to the fact it would be more time and cost efficient than to replace and preserve what was there. So our client wanted it to be turned into a deck instead with plenty of airflow so that water would not be trapped and would dry.
handymanhart88
Feb 171 min read


New Shower Door
We installed a new two panel sliding shower door in an existing bath and shower combo, doing smaller jobs like this is something we enjoy since it helps tie a space together and make it look more complete.
handymanhart88
Feb 101 min read


Greenhouse Roof Replacement
We were hired to fix up the clients green house and put on a new polycarbonate roof panel. Their rafters were falling apart so we replaced them when we replaced the roof.
handymanhart88
Feb 31 min read


At Home Gymnasium Refurbishing
We installed a tongue and groove pine wall in a custom gymnasium, the door and trim are all douglas fir.
handymanhart88
Jan 271 min read


Guest Bedroom Refurbishing
We refurbished this guest bedroom starting by putting in new LVP flooring and baseboards, we put in a new alder window sill, bifold closet doors and repainted the trim.
handymanhart88
Jan 201 min read


Sunken Living Room and Dining Room
Our goal was to create clean lines with the finished product, we put in a false beam rafter and wall caps, that compliment the window sills making it seem more uniform between the transition from the sunken living room to the dining area.
handymanhart88
Jan 141 min read


Re-Staining Intricate Railing
In order to get a uniform finish on this, we used a wire brush then a dust brush to clean all visible surfaces. Since there were a lot of surfaces it took a while to prep and stain, but after doing two coats of stain we were able to achieve a uniform coverage and look.
handymanhart88
Jan 61 min read


Ornamental Arch Over Entryway
The arch is purely ornamental, the roof is supported by the posts and soffit, but the client wanted to have a beam feature on the front of the house. Our goal was to create something interesting with a curve, and to make it seem like it was helping hold up the roof without it actually doing so. The arch was created by cutting an oversized beam into shape.
handymanhart88
Dec 30, 20251 min read


Lock Miter Beam and Wall Cap
We started by taking off the old wall and beam cap, then we made the new lock miter caps. They wanted the fasteners to be hidden so figuring out how to do it in a way that hid them took time, it was extremely important to put them in in a specific order.
handymanhart88
Dec 16, 20251 min read


Siding Replacement
The client wanted a new cement board siding to reduce the risk of fire, they wanted to replace their cedar board siding, wanting it to look similar but with better fire resistance. In order to meet energy requirements and just better insulation in general, we had to add some in. We put in new windows and low E radiant barrier on the roof along with new shingles on the roof.
handymanhart88
Dec 9, 20251 min read


Staircase Renovation
To renovate this staircase we had to replace the plywood underlayment, raised the handrail height to meet code, and put in LVP flooring with a flush mount bull nose stair nosing. We also covered up a hole in the staircase that had a view into the master bedroom.
handymanhart88
Dec 4, 20251 min read


Guest Bedroom Remodel
We remodeled this guest bedroom, by putting in a three way drywall wrap on the windows with a painted sill, painted the doors putting on new handles and knobs, replaced the closet track and hardware, added in a baseboard and LVP flooring along with a smoke detector.
handymanhart88
Dec 2, 20251 min read


Bench Refurnishing
The client wanted the wood replaced on their bench, the metal frame was in amazing condition, so we took some hardwood milled them then reattached them to the frame, after we attached the pieces in the middle of the bench it was able to stand on its own so we could finish putting the rest in. The client wanted to stain it themselves, they used Australian timber oil, honey teak stain.
handymanhart88
Nov 27, 20251 min read


Bathroom Remodel
We remodeled this bathroom, we took out the lights, vanity and medicine cabinet. Then replaced the top piece of door casing with square corners painting it all to the same color, there used to be an accordion door between the toilet and wash room we took it out. New cabinets with a new sink, countertop, and mirror. We custom made the piece that holds the mirror in and connected it to the countertop to make it look seamless like the mirror was built in originally.
handymanhart88
Nov 20, 20251 min read


Living Room Remodel
This client wanted us to remodel their living room. We put in a baseboard, LVP flooring, mini-split system, new light fixtures, took out the wood stove and stone surround, put in four new windows, patched up the drywall and painted. While we were remodeling we found that there needed to be more structural security so we added in some extra supports to a joist in the ceiling to ensure it.
handymanhart88
Nov 12, 20251 min read


Kitchen Remodel
For this remodel we needed to take out all of the cabinet drawers and door faces, put in new knobs and handles, and paint them. We put in a new sink and countertop, we replaced the light fixtures, painted the door to match the colors, put in a new baseboard and LVP flooring.