Remodeling Project, Month 1

  • handymanhart88
  • Apr 7
  • 1 min read

We started onsite work, we surveyed the area and noted that we needed to remove some trees and widen the access road so that we could effectively work. We started by patching up a leak in the roof, and starting on the renovation to make the woodshed into a pump house. We replaced the toilets and had a plumber come out to make sure everything is in order and to get his opinion on it. By the middle of the month we got the trees cut down, widened the access road and had completed the pump house. We have framed the pass through into the master bedroom and we found some moisture between the panes of the guest bedroom meaning it will need to be replaced, for the windows not needed to be replaced we have insulated them and insulated the living room. We finished off the month by prepping the windows that are to be replaced to be taken out, and removed the window jambs. 

 
 
 

Recent Posts

See All
Remodeling Project, Month 4

Prep for the kitchen and bathroom renovations is underway, we are finishing up with the places that needed insulation to be redone and putting sheetrock over it. The pumphouse is all painted and the s

 
 
 
Remodeling Project, Month 3

Electrical and water lines were put in, and are about to be covered and graded over. The garage skirt has been finished, all of the trims and window sills have been created which will be put in soon.

 
 
 
Remodeling Project, Month 2

We started wrapping the drywall around the windows along with the first coat of skim painting. The road was worked on to allow access to the well head so it could be worked on, we also prepped the flo

 
 
 

Comments


Contact Us

Mount Shasta, CA 96067

office: 541-450-1347

**For fastest project completion, complete our contact form! -->

Thank you! We will do our best to contact you within one business day!

bottom of page